Description
- 41,800 s.f.
- Mount Airy, NC
Summary
West & Stem successfully designed and coordinated this challenging phased 41,800 renovation that required much of the facility to remain functional during construction. The following was taken into considerations:
- Noise
- Dust
- Keep lobby open and presentable
- Safety
- Building enclosed construction corridor
- Keep facility operation with strategic utility alterations