Prepac Office and Distribution Phase II

Description

  • 90,000 s.f.
  • Whitsett, NC

Summary

Prepac manufacturing is located at the Rock Creek Center III site in Whitsett NC.  The site includes two office and distribution buildings. Phase I is 260,000 sf. building and Phase II is a 90,000 sf. Building. West & Stem designed the projects in partnership with Landmark Builders of the Triad for the building Owner.  The building’s construction consists of a concrete tilt-up wall and steel frame system.  Flexible features include extended height clear structure for high bay storage, perimeter speed bays for maximizing distribution efficiency, and flexible but attractive façade design for multiple entrance and office location options.