Altec Office and Manufacturing

Description

  • 41,800 s.f.
  • Mount Airy, NC

Summary

West & Stem successfully designed and coordinated this challenging phased  41,800 renovation that required much of the facility to remain functional during construction. The following was taken into considerations:

  • Noise
  • Dust
  • Keep lobby open and presentable
  • Safety
  • Building enclosed construction corridor
  • Keep facility operation with strategic utility alterations